The road to nirvana

free counters

My journey into Photography, Horology, and Audiophilia

Custom Search

Cetus 3D MK3 Extension Board and Heated Bed installation

April 22, 2019

Cetus 3D MK3 printers have a small PCB under the cable guide (white, 3D printed part) mounted at the lower part of the Z pillar.  This junction board splits the signal coming from the "Pyz" connector to the appropriate "Py" and "Pz" connectors. The objective of this upgrade is to replace this dumb junction board with a more functional (electronically, that is) Extension Board.

The Extension Board provides the same functionality as the junction board, plus high power (220W) 24V DC supply distribution, leveling probe support, as well as heated bed support.

I ordered the parts from Tiertime that includes the 220W power brick, heated bed, extension board, and a few silicone tips.

Installation of the Extension Board

Installation of the extension board is pretty straightforward, remember that in its most basic form, it replaces the junction board. Therefore, the Pyz, Py, and Pz connectors simply plugs into the extension board.

  1. Unscrew the junction board PCB and cable guide at the back of the Z pillar, above the Z stepper motor.

STEPPING IOTOR 
TYPE 17HT4003-03N 
60919906 18/05/12

  1. Remove the Pyz (white), Pz (yellow), and Py (red) connectors from the junction board.

:nxs 
EIbC31Guo=wttzf'- 
STEPPlHG МОТИ 
ТУРЕ ПННООЗ-ОЗН 
60919906 18/05/12

ms' STEPPING MOTOR 
TYPE 17HT4003-03N 
60919906 18/05/1

  1. Attach the supplied extension board base (3D printed part) to the back of the Z pillar using the supplied bolt and T-nut.

c 04146 016 
04146 017

  1. Install the Extension Board into the extension board base using the supplied screws.

cetptev.S3xpe tec.. 
SKU:BC086 
{E; iS7P2Ji7a- 
Pu2—maan 
016 
au33 
DU31 
RU31 Ru 2 
QU31 
o 
PZO 
cp6 CON2 
cps 
017 
o 
PZI 
aoo 
Cp7TciSl

  1. Insert the Yellow and Red connectors into the extension board "Pz" and "Py" connectors, respectively.
  2. Insert the White connector into the extension board "Pyz" connector.

63*70 ιεο?Ιθ.νΙ 
36 G 
ομ2Ι 
pzo 
cp6

  1. Connect the power supply extension cable from the Extension Board to the main board power supply (the right angle connector).

  1. Connect the 220W power brick connector (4-pins) to the Extension Board power input, CON2.
  2. Power on the MK3 and perform initialization and verify that all end stops are working.

Note: If you're going to use your own power supply, Tiertime includes an adaptor (yellow) where you can solder wires from your 24V DC power supply and then plug it into CON2.

Installation of the heated bed

  1. Remove the stock build plate.
  2. Remove the CPU cover.
  3. Insert and secure one end of the 10-connector ribbon cable (FFC) to the mother board "Pw2" (connectors facing down).

Tierti.ne 
V453616 
YL9. U. S. SD. JRDCI 9. 
v45.15 
PGND 
LABEL 
opi 
.Cp22Vą 
002 
0-70 
Rł05 
-cui- r 
Pu2 
Ru3 
Uul 
mol 
'sk u: 
BC0710 
BC0751 
Op2 
SAS 
AX13 
RXI 
'CX6 
0 0081 
RY12 
CY6łp—', 
CY51P—1 
INV 
004 
en. 
go 
9e iŕt@ 
płn." ton 
"hi' Roq 
R02 
903 
Screen 
Ra2t 3!_ - 
Roș 
Pied2 
CZ5 
RZ13 
PRI-I 
IROO N 
0081 
F.ncx8 
cqa 
cza 
JOQ3 
GôK-2F-Y 
00 
Pi edi

  1. Route the 10-connector ribbon cable from the mother board into the Z-axis gap going to the Extension Board.
  2. Insert and secure the other end of the  (FFC) cable to the Extension Board "Pw2-main" again connectors facing down.
  3. Screw the Heated Build Plate into the linear rail and route the ribbon cable to the Z-axis gap.
  4. Insert the Heated Bed 20-connector ribbon cable (FFC)  end  into the Extension Board "Pdb-1"(connectors facing up).

KGi 
DIS Die 
pubd 
cp2

  1. Align the extension board cover and secure with the provided screw.

٧ ٤

The Extension Board

Here are some of my notes about the extension board.

SKU: BC0860

  • Pz (yellow, 2 pins) - connects to Z axis endstop
  • Py (red, 2 pins) - connects to Y axis endstop
  • Pinit2 (blue, 2 pins) - connects to calibration probe
  • Pw2-main (white, 10-pin ribbon) - connects to main board Pw2
  • Pdb-1 (white, 20-pin ribbon) - connects to the heated bed
  • CON2 - connects to the 220W power brick
  • J1 - connects power to the main board
  • PYI (red, 4 pins) -
  • PYO (red, 4 pins) -
  • PZI (no connector) -
  • PZO (no connector) -
  • KG1 (no connector) -